Vol. 11 No. 2 (2015): MEI 2015

Published: 2016-05-24

Articles

  • KAJIAN PENGISIAN BATERAI 75 AH DI PEMBANGKIT LISTRIK TENAGA BAYU

    Wiwik Purwati Widyaningsih, Budhi Prasetiyo
    DOI: https://doi.org/10.32497/eksergi.v11i2.260
  • KECEPATAN ALIRAN MASUK TERHADAP NILAI TOTAL SUSPENDED SOLID (TSS) PADA OVERFLOW HYDROCYCLONE MENGGUNAKAN METODE COMPUTATIONAL FLUID DYNAMIC (CFD) PADA PT.PLN (PERSERO) PEMBANGKITAN TANJUNG JATI B UNIT 3 DAN 4

    - Mulyono, - Margana
    DOI: https://doi.org/10.32497/eksergi.v11i2.261
  • PERANCANGAN TURBIN STRAIGHT BLADE DARRIEUS DENGAN TIGA SUDU

    - Supriyo
    DOI: https://doi.org/10.32497/eksergi.v11i2.262
  • KINERJA MULTISTAGE HP/IP FEED WATER PUMP PADA HRSG DI SEKTOR PEMBANGKITAN PLTGU CILEGON

    F. Gatot Sumarno, - Suwarti
    DOI: https://doi.org/10.32497/eksergi.v11i2.263
  • PENGGUNAAN MIX COAL TERHADAP EFISIENSI PEMBANGKIT DAN BIAYA PRODUKSI LISTRIK (BPL) DI PLTU TANJUNG JATI B UNIT 3

    - Wahyono, Teguh Harijono Mulud
    DOI: https://doi.org/10.32497/eksergi.v11i2.264