Vol. 26 No. 1 (2021): Wahana Teknik Sipil

Articles

  • KAJIAN PERBANDINGAN PENGARUH PENGGUNAAN DINDING PRECAST DENGAN DINDING KONVENSIONAL PADA PROYEK CORDOVA SEMARANG

    Muhamad Arif Rohman, M Agung Wibowo, Nuroji Nuroji
    11-10
    DOI: https://doi.org/10.32497/wahanats.v26i1.2643
  • ANALISIS KINERJA MUTU PEKERJAAN STUKTUR BETON BERTULANG PADA PROYEK PEMBANGUNAN HOTEL, MALL, DAN APARTMENT TENTREM KOTA SEMARANG

    Ryan Dwiyana Putra, Nuroji Nuroji, Hery Suliantoro
    11-24
    DOI: https://doi.org/10.32497/wahanats.v26i1.2644
  • INVESTIGASI FAKTOR PENYEBAB COST OVERRUN OLEH KONTRAKTOR PADA PROYEK JALAN APBD KABUPATEN KARANGANYAR TAHUN 2017 DAN 2018

    Muhammad Nur Sahid, Niza Widiana
    25-36
    DOI: https://doi.org/10.32497/wahanats.v26i1.2645
  • PENGEMBANGAN MANAJEMEN PELAYANAN KALIBRASI ALAT NAVIGASI PENERBANGAN DENGAN PENDEKATAN METODE IMPORTANCE-PERFORMANCE ANALYSIS (IPA)

    Munadi Munadi, Ismiyati Ismiyati, Mudjiastuti Handajani
    37-51
    DOI: https://doi.org/10.32497/wahanats.v26i1.2646
  • ANALISIS PENJADWALAN DAN ALOKASI SUMBER DAYA PADA PROYEK KONSTRUKSI MENGGUNAKAN MICROSOFT PROJECT (Studi Kasus Pekerjaan Struktur Proyek XYZ)

    Danang Isnubroto, Citra Kharisma Putri
    52-65
    DOI: https://doi.org/10.32497/wahanats.v26i1.2647
  • KAJIAN OPERASIONAL SISTEM POLDER UNTUK PENANGANAN BANJIR DAN ROB DI KAWASAN GENUK SEMARANG

    Henny Pratiwi Adi, Imam Wahyudi
    66-75
    DOI: https://doi.org/10.32497/wahanats.v26i1.2648
  • ANALISIS RISIKO PADA PROYEK JALAN LINGKAR UTARA BREBES - TEGAL

    Nadya Shafira Salsabilla, Kartono Wibowo, Hermin Poedjiastoeti
    76-88
    DOI: https://doi.org/10.32497/wahanats.v26i1.2814

Editorial

  • Cover

    i
    DOI: https://doi.org/10.32497/wahanats.v26i1.2815
  • Dewan Penyunting

    ii
    DOI: https://doi.org/10.32497/wahanats.v26i1.2652
  • Daftar Isi

    iii
    DOI: https://doi.org/10.32497/wahanats.v26i1.2816
  • Petunjuk Penulisan

    iv
    DOI: https://doi.org/10.32497/wahanats.v26i1.2654