INVESTIGASI FAKTOR PENYEBAB COST OVERRUN OLEH KONTRAKTOR PADA PROYEK JALAN APBD KABUPATEN KARANGANYAR TAHUN 2017 DAN 2018
DOI:
https://doi.org/10.32497/wahanats.v26i1.2645Keywords:
road construction project, APBD, cost overrun, contractor, SPSSAbstract
The rapid development of road project development cannot be separated from the cost problem which often experiences cost overrun. This swelling can occur if a project management and control is not going well and does not meet the project target. The study was conducted to see the dominant factors that caused the cost overrun by the contractor for the implementation of the Karanganyar District Budget in Central Java Province which took place in 2017 and 2018, by distributing questionnaires to contractors. The results of the respondents collected were 36 respondents with 27 respondents. The questionnaire was processed by data processing using the SPSS (Statistical Package for Social Sciences) version 25 program. Reliability testing of 36 questionnaires showed that there were three unreliable questionnaires. In addition, the validity results of several variables in the questionnaire were obtained, namely one invalid variable. In addition to the validity and reliability tests, parametric statistical tests and multiple linear analysis were also carried out, then the results of the dominant factors that led to the implementation of Cost Overrun were schedule due to the influence of weather, disasters, poor cost control, not taking into account unexpected costs, and interest rates. bank loans, as well as the proportion of dominant cost overruns that occurs between 1% -5%References
Al Addiat, M.F., 2015, Identifikasi Penyebab Pembengkakan Biaya (Cost Overrun) Proyek Perumahan. Tugas Akhir Teknik Sipil. Universitas Sumatra Utara. Medan.
Febrian, R., 2017, Investigasi faktor penyebab Cost Overruns proyek konstruksi di Indonesia: Perspektif kontraktor. Thesis Teknik Sipil. Universitas Katotik Parahyangan, Bandung.
Foster, J.J., Barkus, E., & Yavorsky, C., 2006, Understanding and using advanced statistics. SAGE Publications.
Ghozali, I., 2006, Aplikasi analisis multivariate dengan program SPSS. Badan Penerbit Universitas Diponegoro. Semarang.
Gray, C.F., & Larson, E.W., 2006, Project Management: The Managerial Process. McGraw-Hill/Irwin.
Paparang, T., Walangitan, D.R.O., & Pratasis, P.A.K., 2018, Identifikasi Faktor Penyebab Cost Overrun Biaya Pada Proyek Terminal Antar-Kabupaten-Propinsi Tangkoko Bitung. Jurnal Sipil Statik. 6 (1) 813-822.
Sahid, M.N., & Eliska, A.D., 2019, Manajemen Bahaya Dan Risiko Pada Pekerja Gondola Proyek Apartemen Menara One (Studi Kasus: Menara One Kartasura, Sukoharjo, Jawa Tengah). Neo Teknika, 5(1) 31-39.
Downloads
Published
Issue
Section
License
Authors who publish with this journal agree to the following terms:Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).