INVESTIGASI FAKTOR PENYEBAB COST OVERRUN OLEH KONTRAKTOR PADA PROYEK JALAN APBD KABUPATEN KARANGANYAR TAHUN 2017 DAN 2018

Muhammad Nur Sahid, Niza Widiana

Abstract


The rapid development of road project development cannot be separated from the cost problem which often experiences cost overrun. This swelling can occur if a project management and control is not going well and does not meet the project target. The study was conducted to see the dominant factors that caused the cost overrun by the contractor for the implementation of the Karanganyar District Budget in Central Java Province which took place in 2017 and 2018, by distributing questionnaires to contractors. The results of the respondents collected were 36 respondents with 27 respondents. The questionnaire was processed by data processing using the SPSS (Statistical Package for Social Sciences) version 25 program. Reliability testing of 36 questionnaires showed that there were three unreliable questionnaires. In addition, the validity results of several variables in the questionnaire were obtained, namely one invalid variable. In addition to the validity and reliability tests, parametric statistical tests and multiple linear analysis were also carried out, then the results of the dominant factors that led to the implementation of Cost Overrun were schedule due to the influence of weather, disasters, poor cost control, not taking into account unexpected costs, and interest rates. bank loans, as well as the proportion of dominant cost overruns that occurs between 1% -5%

Keywords


road construction project, APBD, cost overrun, contractor, SPSS

Full Text:

PDF

References


Al Addiat, M.F., 2015, Identifikasi Penyebab Pembengkakan Biaya (Cost Overrun) Proyek Perumahan. Tugas Akhir Teknik Sipil. Universitas Sumatra Utara. Medan.

Febrian, R., 2017, Investigasi faktor penyebab Cost Overruns proyek konstruksi di Indonesia: Perspektif kontraktor. Thesis Teknik Sipil. Universitas Katotik Parahyangan, Bandung.

Foster, J.J., Barkus, E., & Yavorsky, C., 2006, Understanding and using advanced statistics. SAGE Publications.

Ghozali, I., 2006, Aplikasi analisis multivariate dengan program SPSS. Badan Penerbit Universitas Diponegoro. Semarang.

Gray, C.F., & Larson, E.W., 2006, Project Management: The Managerial Process. McGraw-Hill/Irwin.

Paparang, T., Walangitan, D.R.O., & Pratasis, P.A.K., 2018, Identifikasi Faktor Penyebab Cost Overrun Biaya Pada Proyek Terminal Antar-Kabupaten-Propinsi Tangkoko Bitung. Jurnal Sipil Statik. 6 (1) 813-822.

Sahid, M.N., & Eliska, A.D., 2019, Manajemen Bahaya Dan Risiko Pada Pekerja Gondola Proyek Apartemen Menara One (Studi Kasus: Menara One Kartasura, Sukoharjo, Jawa Tengah). Neo Teknika, 5(1) 31-39.




DOI: http://dx.doi.org/10.32497/wahanats.v26i1.2645

Refbacks

  • There are currently no refbacks.


ABOUT JOURNAL

 POLICIES

SUBMISSION

 PEOPLE


OFFICE INFORMATION

 Publisher : Jurusan Teknik Sipil, Politeknik Negeri Semarang  wahanasipil@polines.ac.id, jurnalwahana@gmail.com https://jurnal.polines.ac.id/index.php/wahana
 Department of Civil Engineering, Politeknik Negeri Semarang (State Polytechnic of Semarang) Jl. Prof. Sudarto, SH, Tembalang, Semarang, Indonesia 50275  +62 24 7473417 Ext. 212 For Journal Subscription

Creative Commons License
Wahana TEKNIK SIPIL: Jurnal Pengembangan Teknik Sipil (p-ISSN : 0853-8727 | e-ISSN : 2527-4333) is published by Politeknik Negeri Semarang under Creative Commons Attribution 4.0 International License.