ANALISIS PENJADWALAN DAN ALOKASI SUMBER DAYA PADA PROYEK KONSTRUKSI MENGGUNAKAN MICROSOFT PROJECT (Studi Kasus Pekerjaan Struktur Proyek XYZ)

Authors

  • Danang Isnubroto Jurusan Teknik Sipil Politeknik Negeri Semarang
  • Citra Kharisma Putri Satuan Kerja Pelaksanaan Jalan Nasional Daerah Istimewa Yogyakarta

DOI:

https://doi.org/10.32497/wahanats.v26i1.2647

Keywords:

construction, project management, microsoft project, resources

Abstract

One of the computer applications that can be used in project management control is the Microsoft Project application. With Microsoft Project , information related to activities that fall into the critical trajectory and allocation of resource placement can be known, so that the project does not experience delays and a decrease in work productivity. Based on the results of the analysis using the Microsoft project, it is found that activities are included in the critical trajectory, namely: pile work, soldier pile, excavation, excavation fireplace, brickwork installation, work floor, pile cap and superstructure work. The results of the analysis show the need for the number of workers from the 1st month to the 8th month: 31, 43, 43, 40, 37, 31, 10. The needs of the foreman are: 2, 3, 3, 2, 2, 2 , 2, 1. For crane operator resources in the 1st month and 2nd month is as many as 3 people. Subcontractor 1 and subcontractor 2 require as many as 1 person in the resources of the 2nd month to the 3rd month. A mason is needed from the 2nd to the 8th month: 12, 9, 8, 7, 7, 6, 2. Resource analysis for the head mason every month: 3, 3, 2, 2, 2, 2, 1. Analysis of the allocation of resource placement can be carried out in several stages if a graph of the resources fluctuates or does not comply with the principle of resource allocation.

Author Biographies

Danang Isnubroto, Jurusan Teknik Sipil Politeknik Negeri Semarang

Jurusan Teknik Sipil Politeknik Negeri Semarang

Citra Kharisma Putri, Satuan Kerja Pelaksanaan Jalan Nasional Daerah Istimewa Yogyakarta

Satuan Kerja Pelaksanaan Jalan Nasional Daerah Istimewa Yogyakarta

References

Ervianto, W. I., 2005, Manajemen Proyek Konstruksi, Yogyakarta: Andi

Husen, A., 2010, Manajemen Proyek Perencanaan, Penjadwalan & Pengendalian Proyek, Yogyakarta: Andi

Hutagaol, J.D., 2013, Perbandingan Metode Critical Path Method (CPM), Precedence Diagram Methode (PDM) & Line of Balance (LOB) terhadap Proyek Repetitif, Jurusan Teknik Sipil, Universitas Diponegoro, Semarang

Ladda, Shubam, Prerna Chanda and Sneha Khedekar., 2017, Planning and Scheduling of a Project Using Microsoft Project, International Journal of Advanced Research, AISSMS COE, Pune, India

Chaudhury, A.R., S.K. Nagaraju, B. Sivakonda Reddy, 2012, Resource Management In Construction Projects ”“ A Case Study, International Journal (ESTIJ), IRACST ”“ Engineering Science and Technology, 2012

Laksito, B., 2005, Studi Komparatif Penjadwalan Proyek Konstruksi Repetitif menggunakan Metode Penjadwalan Berulang (RSM) & Metode Diagram Preseden (PDM), Media Teknik Sipil, Universitas Sebelas Maret, Surakarta

Luthan, P.L.A & Syafriandi, 2017, Manajemen Konstruksi dengan Aplikasi Microsoft Project, Yogyakarta: Andi

Sharanyasreenivas, J., G. Gajalakshmi, K. Ravi Theja, 2017, Project Planning, Scheduling and Preparation of Quality Assurance Control Documents, International Research Journal of Engineering and Technology (IRJET), Structural Engineering & Construction Management, GVIC, Madanapalle, A.P., India

Analisa Harga Satuan Pekerjaan (AHSP) Bidang Pekerjaan Umum, Kementerian Pekerjaan Umum, Jakarta, 2012

Downloads

Published

2021-06-01