RANCANG BANGUN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (PLTMH) POLITEKNIK PERKERETAAPIAN INDONESIA MADIUN
Abstract
Keywords
Full Text:
PDFReferences
Hadiyanto, R., & Bakri, F. (2013). Rancang Bangun Prototipe Portable Mikro Hydro Menggunakan Turbin Tipe Cross Flow, 19(1), 19–25.
Irawan, D.,& Metro, M. (N.D.). Pembuatan Turbin Mikrohidro Tipe Cross-Flow Sebagai Pembangkit Listrik Di Desa Bumi Nabung Timur, 3(116), 7–12.
Sutarno. (1973). Sistim Listrik Mikro Hidro Untuk Kelistrikan Desa. Yogyakarta : Ugm Yogyakarta
S. Sunardi, W.A. Wirawan, A. Aghastya. (2018). Estimation Of Geothermal Potential As A Power Supply (Reactivation Planning Of The Madiun Slahung Ponorogo Railroad. Jurnal Perkeretaapian Indonesia (Indonesian Railway Journal) Vol. 2, No.2, 2018. Hal. 104-106.
W.A. Wirawan, A. Aghastya, A. L. Lailya. (2019). Modeling Of Atmega 2560 Microcontroller-Based Train Passenger Counter. Jurnal Perkeretaapian Indonesia. Vol. 3, No. 1, 2019. Hal 55-61.
W.A. Wirawan, H.B. Wahjono, & F. Rozaq. (2020). Desain Prototype Teknologi Automatic Surface Treatmen Untuk Meningkatkan Ketahanan Jalan Rel Kereta Api. Jurnal Perkeretaapian Indonesia, Vol. 4, No. 1, 2020. Hal. 75-79.
DOI: http://dx.doi.org/10.32497/eksergi.v17i1.2168
Refbacks
- There are currently no refbacks.
Mechanical Engineering Department
Politeknik Negeri Semarang
Jl. Prof. Sudarto, SH., Tembalang, Semarang
Phone (024) 7478384; Fax: (024) 7472396
WA : 08112882883
Email: jurnal.eksergi@polines.ac.id
This work is licensed under a Creative Commons Attribution 4.0 International License.