EVALUASI KAPASITAS BENDUNG UNTUK PERENCANAAN CHECKDAM SEBAGAI PENGENDALIAN SEDIMENTASI DI BENDUNG LOGUNG

Pambudi Nur Utomo, Mochamad Solikin, Purwanti Sri Pudyastuti, Sri Sunarjono

Abstract


Sedimentation that occurs in the Logung Weir in Kudus Regency can reduce the capacity of irrigation services. The conturmeisure for sediment by build a check dam or normalization. The methods used in this analysis include hydrological analysis using the Hec-HMS application to obtain a 50 year planned flood discharge, erosion rate analysis using the Universal Soil Loss Equation (USLE) method and sediment analysis using the Sediment Delivery Ratio (SDR) method. Furthermore, comparing the efficiency between normalization work and making check dams and their maintenance. Analysis of the amount of sediment in the Logung Dam catchment is 1.18 mm/year with a sedimentation rate of 0.27%, which is 4750.87 m³/year. The sediment storage capacity at Logung Weir is 1,918.00 m³, it is necessary to increase the storage capacity of 2,832.61 m³. For scenario 1, normalization/dredging is carried out 3 times a year, with an operational cost of IDR 707,425,977.00/year. Within a period of 50 years the total cost that must be incurred is Rp. 155,503,120,928.41. Scenario 2 is the construction of a check dam at the upstream of Logung Weir, the location is suggested at Sta. 11+50. The cost required Rp. 4,171,067,132.16 for construction and annual dredging costs of Rp. 235,808,659.01. Within a period of 50 years the total costs to be incurred amounted to 56,005,440,774.97. Comparison of the 2 scenarios shows that a more efficient long-term value is the construction of check dams and their operations.


Keywords


logung weir, chekdam control, hec-hms, usle, sdr (sediment delivery ratio)

Full Text:

PDF

References


Garg, V., & Jothiprakash, V., 2008, Estimation of useful life of a reservoir using sediment trap efficiency. Journal of Spatial Hydrology. Journal of Spatial Hydrology, 8 (2), 1–14.

Handayani, W., Noor, G., & Rido, M.T., 2019, Perencanaan Bangunan Penahan Sedimen (Check Dam Ii) Di Daerah Aliran Sungai Ciliman Desa Leuwikopo, Kecamatan Gunungkencana, Kabupaten Lebak. Journal of Sustainable Civil Engineering, 1 (1), 41–60.

Juana, B.B., 2012, Laporan: Review Desain Bendungan Logung Kabupaten Kudus.

Kamiana, 2011, Teknik Perhitungan Debit Rencana Bangunan Air. Graha Ilmu.

Mayrina, C.G., 2019, Evaluasi Keamanan Bendung Logung Terhadap Overtopping Dengan Analisis Routing

Nur, I., 2019, Prediksi Umur Waduk Logung Berdasarkan Erosi Lahan dan Hasil Sedimen. 187–194.

Setyono, 2017, Optimasi Rencana Pola Tanam Pada Daerah Irigasi Logung Kudus Dengan Menggunakan Program Linier. 118.

Sosrodarsono, S., 1985, Perbaikan dan Pengaturan Sungai. Jakarta: Pradnya Paramita




DOI: http://dx.doi.org/10.32497/wahanats.v29i1.5650

Refbacks

  • There are currently no refbacks.


ABOUT JOURNAL

 POLICIES

SUBMISSION

 PEOPLE


OFFICE INFORMATION

 Publisher : Jurusan Teknik Sipil, Politeknik Negeri Semarang  wahanasipil@polines.ac.id, jurnalwahana@gmail.com https://jurnal.polines.ac.id/index.php/wahana
 Department of Civil Engineering, Politeknik Negeri Semarang (State Polytechnic of Semarang) Jl. Prof. Sudarto, SH, Tembalang, Semarang, Indonesia 50275  +62 24 7473417 Ext. 212 For Journal Subscription

Creative Commons License
Wahana TEKNIK SIPIL: Jurnal Pengembangan Teknik Sipil (p-ISSN : 0853-8727 | e-ISSN : 2527-4333) is published by Politeknik Negeri Semarang under Creative Commons Attribution 4.0 International License.
slot gacor slot gacor hari ini slot gacor 2025 demo slot pg slot gacor slot gacor