ANALISIS RISIKO PADA PROYEK JALAN LINGKAR UTARA BREBES - TEGAL

Nadya Shafira Salsabilla, Kartono Wibowo, Hermin Poedjiastoeti

Abstract


Risk is a consequence of uncertain conditions. Risk will always exist in every construction project because basically a construction project is a unique, dynamic and risky activity. The purpose of this research is to analyze the risks in the construction project of the North Ring Road Brebes - Tegal and the purpose of this study is to identify risks, conduct risk level assessments and handle high risks that affect the project. This study uses two data, namely secondary data and primary data. Primary data, namely risk identification data, risk level data and risk response data. Secondary data, namely organizational structure data. The data that has been obtained are then analyzed using the Probability and Impact Matrix (PIM) method and followed by calculating the risk level value. Based on this value, the category and ranking of each risk is then determined. In the last stage, analysis of the handling of the highest risk is carried out. The results of the risk identification analysis of this study obtained 33 risks, then the results of the analysis using the Probability and Impact Matrix (PIM) method obtained 3 (three) high risks, namely incomplete design data, conflicts of interest with residents, inadequate project information (soil testing and reports survey). Ten risks fall into the moderate category and 20 other risks fall into the low category.


Keywords


risk, ring road project, frequency and impact matrix

Full Text:

PDF

References


Arikunto, S., 2012, Prosedur

Penelitian Suatu Pendekatan

Praktek. Jakarta: Rineka Cipta

Asmarantaka, 2014, Analisis Risiko

yang Berpengaruh Terhadap

Kinerja Proyek pada

Pembangunan Hotel Batiqa

Palembang. In : Jurnal Teknik

Sipil dan Lingkungan, Vol. 2,

no. 3, pp. 483-491.

Choudhry, R.M., and Aslam, M.A.,

, Risk Analysis of Bridge

Construction Projects in

Pakistan. Proceedings of

International Council for

Research and Innovation in

Building and Construction

(CIB). Purdue University.

Darmawi, H., 2008, Managemen

Risiko. Jakarta: Bumi Aksara.

Fandopa, Riza, 2012, Pengelolaan

Risiko pada Pelaksanaan

Proyek Jalan Perkerasan

Lentur PT X dalam rangka

Meningkatkan Kinerja Mutu

Proyek. Tesis Universitas

Indonesia, Indonesia.

Flanangan, R & Norman, G., 1993,

Risk Management and

Construction, London :

Blackwell Science

Iacob, V.S., 2014, Risk Management

and Evaluation and Qualitative

Method Within The Project.

Ecovorum, Vol.3, Issue 1, pp:

-67.

International Standard, 2009, Risk

Management-Principles and

Guidelines. Geneva:ISO.

Project Management Institute, 2013, A

Guide to the Project

Management Body of

Knowledge – Fifth Edition

PMBOK. Project ManagementInstitute,

Inc. Pennsylvania.

Soeharto, Iman, 1999, Manajemen

Proyek (Dari Konseptual

sampai Operasional) Jilid I.

Jakarta: PT. Gelora Aksara

Pratama.

Soemarno, M.S, 2007, Risiko

Penggunaan Lahan dan

Analisisnya Laboratorium

PPJP Jurusan Tanah, Malang.

Sonhadji, 2011, Manajemen Risiko

Dalam Project Jalan Tol. Tesis

Universitas Islam Sultan

Agung, Semarang.

Sugiyono, 2008, Statistika untuk

Penelitian. Alfabeta. Bandung.

Taufik, H.A.R.M., 2010, Pengelolaan

Risiko Kualitas pada Tahap

Pelaksanaan Konstruksi di

Lingkungan PT. X. Tesis

Universitas Indonesia,

Indonesia.

Vidivelli, B., Vidhyasagar, E., and

Jayasudha, K., 2017, “Risk

Analysis in Bridge

Construction Projects”. In :

International Journal of

Innovative Research in Science,

Engineering and Technology,

Vol. 6 no. 5, pp 8271-8284.

Wiguna, I.P.A., and Scott, S., 2006,

Relating Risk To Project

Performance In Indonesian

Building Contracts. In :

Journal Construction

Management and Economics,

Vol. 24, no. 11, pp. 1125–

Winaktu, G., 2014, “Penentuan Skala

Prioritas Risiko pada

Pembangunan Jembatan Afiat

Desa Kanigoro Kecamatan

Pagelaran Kabupaten

Malang”. In : Jurnal Info

Manajemen Proyek pp. 11-19

Zou, Zhang, G., and Wang, J.Y., 2006,

Indentifying Key Risk in

Construction Projects: Life

Cycle and Stakeholder

Perspectives.




DOI: http://dx.doi.org/10.32497/wahanats.v26i1.2814

Refbacks

  • There are currently no refbacks.


ABOUT JOURNAL

 POLICIES

SUBMISSION

 PEOPLE


OFFICE INFORMATION

 Publisher : Jurusan Teknik Sipil, Politeknik Negeri Semarang  wahanasipil@polines.ac.id, jurnalwahana@gmail.com https://jurnal.polines.ac.id/index.php/wahana
 Department of Civil Engineering, Politeknik Negeri Semarang (State Polytechnic of Semarang) Jl. Prof. Sudarto, SH, Tembalang, Semarang, Indonesia 50275  +62 24 7473417 Ext. 212 For Journal Subscription

Creative Commons License
Wahana TEKNIK SIPIL: Jurnal Pengembangan Teknik Sipil (p-ISSN : 0853-8727 | e-ISSN : 2527-4333) is published by Politeknik Negeri Semarang under Creative Commons Attribution 4.0 International License.