Analisis Pengelolaan Sampah Terkait Pembangunan Polder Kali Banger Di Wilayah Kecamatan Semarang Timur
DOI:
https://doi.org/10.32497/wahanats.v18i2.979Keywords:
chopped, compaction, volume reductionAbstract
Semarang is a subdistrict of east lowlands adjacent to the shore which consists of 10 villages and a catchment area Banger. Polder is a flood control system and runoff the community based management is a pilot project in Indonesia, located at the eastern most region of Semarang District land surface elevation below sea level tide. Disposal of rain water that fell in the region to the sea or water bodies need to help pump. In connection with the issue of waste management is carried optimal efforts to hold and manage the garbage that is not transported before it goes into the river and impede performance polder pump. One way of method 3R ( Reuse, Reduce and Recycle ) are performed and optimized in research in this area is to chop / grind waste to reduce its volume ( Volume Reducing Waste / VWR ) and to reduce the air content in the waste compaction using tools hydraulic jack with a capacity of 2 ton ( Hidrolic Compactioning System / HCS ). trial was made with two kinds of conditions in the experiment without the waste samples sorted and experiment with sorted. Of waste compaction test by hand without the obtained results are sorted and enumerated volume reduction of 17.3 % (0.000812 m3 from 0.0047 m3 ) determining the value of the correlation coefficient R2 = 0.821 or R = 0.906, it is meaning that compaction can not be optimal because the condition of waste still influenced by the mix of many types of material and content of the air in it. Further trials compaction of waste with hydraulic equipment and waste sorted and chopped / grinded results obtained R2 = 0.885 or R = 0.940, for the meaning that optimal compaction due to the condition of selected waste (organic) and content of the air inside is removed and segregated garbage can be reused or sold. The continued impact of the measures is a reduction in the number of garbage trucks ritation and can save transportation costs and fuel in accordance with national austerity program. In addition, if the waste disposed to landfill (TPA), the volume reduction process will extend the life of the landfill. The new research is a preliminary study to examine the percentage of reduction in production, reduction of production costs and transport costs in managing the waste that does not go in the garbage or dumped into the Banger. The purpose of this paper is one effort to disseminate to the public and local government in the optimal waste management and integrated with the flood disaster management should be in conjunction with waste manage mentand waste water.
Downloads
Published
Issue
Section
License
Authors who publish with this journal agree to the following terms:Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).