APLIKASI VALUE ENGINEERING PADA PEKERJAAN TAMBAH KURANG UNTUK MENINGKATKAN EFISIENSI BIAYA KONTRAKTOR (Studi Kasus: Gedung D BPOM Jakarta)
DOI:
https://doi.org/10.32497/wahanats.v29i2.6155Keywords:
rekaya nilai, value engineering, keuntungan, alternatif desain, pekerjaan tambah kurangAbstract
Cost planning is one of the important things in a development project, both for the
project owner and the implementing contractor. The contractor has a planned cost
target at the tender stage, however, changes in costs may occur during the
implementation period due to additional or less work and resulting in changes in
costs. To be able to achieve the cost efficiency target, this can be done by carrying
out value engineering. The stages of the value engineering method consist of the
information stage, function analysis stage, creativity stage, evaluation stage,
development stage and recommendation stage. The application of value engineering
in the BPOM Building D Construction Project can provide an increase cost and still
maintain function. Contractor get cost efficiency of IDR 1,528,657,929,- or 2.52%,
while the project owner gets a cost efficiency of IDR 1,182,279,319 or 1.66%.
References
Albertus, S., Miftahul, H., Siswoyo, 2020, Penerapan Value
Engineering pada Proyek Pembangunan Puskesmas Rego Manggarai Barat NTT. Surayaba: Jurnal Rekasaya dan
Manajemen Konstruksi.
Candra, P., 1987, Project Preparation, Appraisal, Budgeting and
Implementation. Tata McGraw-Hill Publishing Company Ltd.
Dell'Isola, 1982, Value Engineering: Partical Application for Design
Construction Maintenance & Operations. USA : Company, Inc.
Dhanianto, S., 2021, Analisa Value Engineering Pada Proyek
Pembangunan Pasar Glendoh Kabupaten Grobogan. Semarang: Universitas Islam Sultan Agung.
Dimas, P., 2019, Aplikasi Value Engineering Untuk Optimalisasi Pembiayaan Pada Proyek Pembangunan Gedung Kuliah II UIN Suska Riau. Riau: Universitas Islam Riau Pekanbaru.
Kasi, M., Snodgrass, & Thomas, J., 1994, Course guide for civil and environ-mental engineering C240-A362. An Introduction to Value Analysis and Value Engineering for Architects, Engineer and Builders.
Kelly, J., & Male., 2004, Value Management of Construkction Project. London.
Khalim., dkk., 2021, Analisis Contract Change Order pada Pelaksanaan Proyek Apartemen Alton Semarang. Semarang: Wahana Teknik Sipil Politeknik Negeri Semarang.
Kormomolin, dkk., 2020, Penerapan Value Engineering pada Pembangunan Lahan Parkir Fakultas Teknik Universitas Pattimura. Ambon: Jurnal Simetrik.
Rizki, Putra., dkk., 2022, Anlisis Faktor Penyebab Pekerjaan Tambah Kurang bagi Penyedia Jasa Konstruksi Pekanbaru. Pekanbaru: Prosiding SENKIM: Seminar Nasional Karya Ilmiah Multidisiplin.
SAVE, S.I., 2007, 2007 edition, Value Standard and Body Knowledge.
Younker, D., 2003, Value Engineering: Analysis AndbMethodology. CRC Press.
Downloads
Published
Issue
Section
License
Authors who publish with this journal agree to the following terms:Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).