KAJIAN ANALISIS HARGA SATUAN PEKERJAAN (AHSP) SNI 2016 DIBANDINGKAN DENGAN BINA MARGA 2020 PADA PEKERJAAN LAPIS ASPAL AC-BC DAN AC-WC
DOI:
https://doi.org/10.32497/wahanats.v28i1.4564Keywords:
unit price of work, SNI, Bina MargaAbstract
This research is a type of quantitative research with a case study approach, namely calculating the analysis of the unit price of road works carried out using the SNI 2016 and Bina Marga 2020 analysis methods. The locations used in this research are Jalan Dewi Sartika and Jalan Mojoranu Mastrip, Bojonegoro Regency. Based on the research results, it is known that there is a difference in the unit price of the work between the 2016 SNI analysis and the 2020 Bina Marga. In the Asphalt Concrete-Binder Course (AC-BC) work using the Bina Marga 2020 method, the difference in work unit prices is greater than the 2016 SNI analysis of 1.09% for Jalan Dewi Sartika and 4.38% for Jalan Mojoranu Mastrip. Whereas the Asphalt Concrete-Wearing Course (AC-WC) work using the Bina Marga 2020 method also has a larger difference in the unit price of work compared to the 2016 SNI analysis of 47.54% for Jalan Dewi Sartika and 51.77% for Jalan Mojoranu Mastrip. The ratio of unit price comparisons between the 2016 SNI analysis and 2020 Bina Marga for the Asphalt Concrete-Binder Course (AC-BC) work using the Bina Marga 2020 method has a larger ratio difference compared to the 2016 SNI analysis of 1.01 for Jalan Dewi Sartika and 1.04 for Jalan Mojoranu Mastrip. Meanwhile, the Asphalt Concrete-Wearing Course (AC-WC) work using the Bina Marga 2020 method also has a larger ratio difference compared to the 2016 SNI analysis of 1.48 for Jalan Dewi Sartika and 1.52 for Jalan Mojoranu Mastrip. All supporting components in the Asphalt Concrete-Binder Course (AC-BC) and Asphalt Concrete-Wearing Course (AC-WC) have different differences in work unit prices and ratios. Based on these differences it is known that the most efficient components are workers and foremen.References
Alami, Nurmansyah, dkk., 2021, “Studi Komparasi Perbandingan Rencana Anggaran Biaya Antara Metode Analisa Harga Satuan Pekerjaan (AHSP) Dan Standar Nasional Indonesia (SNI).” Jurnal Ilmu Teknik Sipil Surya Beton, vol. 5, no. 1, 2021, pp. 10”“19
Khasanah, Faulidatul, dan Sugeng Dwi Hartantyo, 2016, “Analisa Biaya Bangunan Pekerjaan Konstruksi Baja Menggunakan Metode HSPK Dan SNI.” CIVILLa Vol . 1 No. 2 September 2016, vol. 1, no. 2, 2016
Mawardi, Edi, 2022, Analisa Perbandingan Anggaran Biaya Dengan Menggunakan. no. 2, 2022, pp. 123”“35
Nurhamdi, Muh Qadri, dan Ikhsan, 2022, “Analisa Perbandingan Estimasi Anggaran Biaya Antara Metode AHSP SNI 2016 Dengan Metode Perhitungan Kontraktor ( Studi Kasus Proyek Canal Wall Strengthening Sorowako Kabupaten Luwu Timur ) Comparison Analysis of Budget Estimation Between The 2016 AHSP SNI.” Journal of Applied Civil and Environmental Engineering, vol. 2, no. 1, 2022, pp. 62”“70
Permadi, Aditya, 2018, “Analisis Estimasi Biaya Konstruksi Menggunakan Analisis Harga Satuan Pekerjaan 2013 Dan 2016.” Jurnal Teknika, vol. 2, no. 1, 2018, pp. 1”“12
Ratag, Kezia Aprilia, dkk, 2021, “Perbandingan Rencana Anggaran Biaya Antara Metode SNI Dengan Metode AHSP Pada Proyek Gedung Pendidikan Fakultas Teknik.” Tekno, vol. 19, no. 79, 2021, pp. 299”“305
Siburian, David P., dkk., 2017, Analisis Perbandingan Estimasi Biaya Menggunakan Metode SNI 2017 Dan ASHP 2016 (Studi Kasus : Proyek Pembangunan Gedung Kuliah Terpadu Universitas Palangka Raya). 2017, pp. 138”“43
Siregar, Habibi Khairul Anwar dkk., 2022, Analisa Perbandingan Nilai Harga Satuan Pekerjaan (AHSP) Dengan Nilai Harga Standar Nasional Indonesia (SNI) Pada Pekerjaan Pembangunan Gedung/Ruang Baru Puskesmas Padangmatinggi Kota Padangsidimpuan. no. 1, 2022, pp. 60”“70
Triana, Devita, dkk., 2018, Analisis Perbandingan Harga Satuan Antara Metode Analisa Harga Satuan Pekerjaan Spesifikasi 2018 Dan Lapangan Untuk Pekerjaan Peningkatan Jalan Paket 2 Ruas Jalan AMD Manunggal Banjarmasin. 2022, pp. 2018”“20
Downloads
Published
Issue
Section
License
Authors who publish with this journal agree to the following terms:Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).