FAKTOR PENYEBAB KETERLAMBATAN PROYEK PEMBANGUNAN MASJID 99 KUBAH CENTER POINT OF INDONESIA MAKASS
DOI:
https://doi.org/10.32497/wahanats.v28i1.4561Keywords:
delay in project implementation, delay factor, Relative Rank IndexAbstract
The construction of the 99 Dome Asmaul Husna Mosque Center Point of Indonesia Makassar has been delayed. Therefore the purpose of this study is to analyze the factors causing the delay in the construction of the mosque. The method of data collection was in the form of direct observation on the project and distributing questionnaires to those involved in the project, totaling 20 respondents. Test the validity and reliability of the 54 sub-factors of delay obtained from the results of literature review and observations in the field, categorized into 10 factors. Data analysis using RRI obtained 10 top ranking subfactors from seven factors. The conclusion based on the results of the research is that the sub-factors that cause delays in the implementation of the project sequentially are, the unexpected events of the COVID'19 pandemic, the RRI value = 0.892, the ability of the foreman or operator who is lacking in operating equipment, the RRI value = 0.800, the intensity of rainfall, the RRI value = 0.775, the workforce discipline, the RRI value = 0.767, the planned work order that is not well structured/integrated RRI value = 0.750, work space requirements RRI value = 0.750, payment difficulties by the owner RRI value = 0.742, access to the project location RRI value = 0.717, the work that has been completed must be corrected due to an error in processing the RRI value = 0.667, as well as the process of checking and evaluating the progress of work past the agreed schedule RRI value = 0.658References
Assaf, S. A., Al-Hejji, S, 2006.,Causes of delay in large construction projects in Saudi Arabia. Internasional Journal of Project Management, 24(4), 349-357
Basyiroh, N.N., Moehammad, & Nugraha, A, 2018, Analisis Persebaran dan Kebutuhan Tempat Ibadah Berdasarkan Jumlah Penduduk Berbasis Sig (Studi Kasus: 4 Kelurahan di Kecamatan Banyumanik) Jurnal Geodesi Undip Oktober 2018 Jurnal Geodesi UNDIP, 7 (4), 27-36
Cooper, D. R, & Schindler, P. S. 2014, Bussiness Research Methods. 12th. Twelfth Edition. New York: Mc Graw Hill
Ghozali, I. 2012, Aplikasi Analisis Multivariate dengan Program IBM SPSS 20, Semarang. UNDIP
González, P., González, V., Molenaar, K & Orozco, F., 2014, Analysis of Causes of Delay and Time Performance in Construction Projects. Journal of Construction Engineering and Management, 140(1), 04013027
Harpe, S.E, 2015, Review article : How to analyze Likert and other rating scale data, Currents in Pharmacy Teaching and Learning 7. Elsevier Inc.. pp 836”“850
iNews Sulsel, 2020, Pengerjaan Masjid 99 Kubah Terhambat Lagi karena Pekerja Terpapar Covid. http://sulsel.inews.id/ 18 Agustus 2020. Akses Desember 2021 iNew Sulsel, 2021, Pembangunan Masjid Kubah 99 Terlambat
Mangitung, D.M., 2006, Faktor-Faktor yang Penting dalam Sistem Penilaian Kompetensi Kontraktor Berdasarkan Persepsi Kontraktor di Kota Palu. Majalah Ilmiah MEKTEK Tahun VIII No. 1 Januari 2006 Munsir, I., 2022, Mulai Berfungsi Hari Ini, Berikut 8 Fakta Masjid 99 Kubah
Peraturan Menteri, 2006, Peraturan Bersama Menteri Agama Nomor: 9 Tahun 2006 Dan Menteri Dalam Negeri Nomor : 8 Tahun 2006. Tentang Pedoman Pelaksanaan Tugas Kepala Daerah/Wakil Kepala Daerah Dalam Pemeliharaan Kerukunan Umat Beragama, Pemberdayaan Forum Kerukunan Umat Beragama, Dan Pendirian Rumah Republika, 2021, Target Pembangunan Masjid 99 Kubah Alami Keterlambatan https://www.republika.co.id Ӽ 12 Juli 2021. Akses Desember 2021
Sambasivan, M. & Soon, Y.W., 2007. Causes and Effects of Delays in Malaysian Construction Industry. International Journal of Project Management, 25(5):517-526
Sugiyono, S., 2015, SPSS20 Pengolah Data Statistik DI Era Informasi. PT Elax Media Komputindo. Jakarta World Population Review, 2020, Populasi Muslim di Indonesia adalah yang terbanyak di dunia
Downloads
Issue
Section
License
Authors who publish with this journal agree to the following terms:Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).