Kajian Waktu Penyelesaian Metode Crane Dan Metode Launcher Dalam Pelaksanaan Erection Girder Jembatan (Studi Kasus : Pembangunan Jalan Tol Semarang ”“ Solo Ruas Salatiga ”“ Boyolali Sta 40+409 ”“ Sta 71+785)
DOI:
https://doi.org/10.32497/wahanats.v24i1.1606Keywords:
erection girder, precast girder, crane method, launcher methodAbstract
The Semarang-Solo Toll Road Project for the Salatiga-Kartasura Section is one part of the Trans Java toll road development project, one of the jobs in the form of an erection girder with the method used, namely the Crane and Launcher methods. The purpose of this study is to compare the completion time between Crane and Launcher Methods with field studies and analysis. Stages of research include literature studies, primary data collection in the form of variable time of completion and secondary data then analyzed by comparing the completion time of the second method of erection girder on girder with a span of 20.8 meters and 40.8 meters. The results of the comparison of completion time were obtained on a 20.8 meter span erection girder seen from the shortest time Crane Method was more efficient 61.44% than the Launcher Method, the longest time Crane Method was more efficient 32.13% of the Launcher Method, and Method average time Crane is more efficient 52.15% than the Launcher Method. Then on the span erection girder 40.8 m seen from the shortest time Crane Method is more efficient 61.48% than the Launcher Method, the longest time Crane Method is more efficient 29.82% than the Launcher Method, and the average time of the Crane Method is more efficient 41, 81% of the Launcher Method.References
Husein, W.S, Dinariana, D., 2013, Perbandingan Gantry Dan Mobile Crane Pada Jalan Layang Dari Segi Waktu, Metode Kerja, Dan Biaya. https://www. google.com/ url?sa=t&rct= j&q= &esrc=s&source=, (13 Agustus 2018).
Octario, T., 2015, Metode Pelaksanaan Dan Analisis Produktivitas Gantry Launcher Pada Pekerjaan Erection Girder Proyek Flyover Palur, Tugas Akhir, Yogyakarta, Jurusan Teknik Sipil Universitas Gajah Mada.
Permadani, C.P., 2016, Metode Pelaksanaan Erection PCI Girder dan Analisis Produktivitas Menggunakan Alat Gantry Launcher pada Proyek Pembangunan Jalan Tol Surabaya-Mojokerto Seksi 1B. Tugas Akhir, Yogyakarta, Jurusan Teknik Sipil Universitas Gajah Mada.
Pratama , D.D., 2013, Analisa Perbandingan Metode Erection Girder Menggunakan Launcher Girder Dan Temporary Bridge Dari Segi Biaya Dan Waktu Pada Jembatan Kali Surabaya Mojokerto, JURNAL TEKNIK POMITS, Vol. 1, No. 1, Hal. 1-10.
PT. Jatra Sejahtera, 2018, Rev 1, Erection Girder Jembatan Sungai Putih Menggunakan Metode Launcher Crane, Jombang.
Syah, M.S., 2004, Manajemen Proyek Kiat Sukses Mengelola Proyek, Cetakan Pertama. Jakarta: Gramedia Pustaka Utama. Jombang.
Tistogondo, Julistyana, 2004, Studi Efektifitas Waktu dan Biaya Pelaksanaan Erection PCI Girder dengan Metode Crawler Crane dan Roller Skate (Kasus: Proyek Pembangunan Jembatan Suramadu Sisi Surabaya), , Jurnal Neutron, Vol. 4, No. 1, Hal. 79-106.
Downloads
Published
Issue
Section
License
Authors who publish with this journal agree to the following terms:Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).