Kajian Waktu Penyelesaian Metode Crane Dan Metode Launcher Dalam Pelaksanaan Erection Girder Jembatan (Studi Kasus : Pembangunan Jalan Tol Semarang – Solo Ruas Salatiga – Boyolali Sta 40+409 – Sta 71+785)

Farouq Khoirul Izza, Muhammad Ariya Praditama, Claudia Nimas Kirana, Karnawan Joko Setyono, Sudarmono Sudarmono

Abstract


The Semarang-Solo Toll Road Project for the Salatiga-Kartasura Section is one part of the Trans Java toll road development project, one of the jobs in the form of an erection girder with the method used, namely the Crane and Launcher methods. The purpose of this study is to compare the completion time between Crane and Launcher Methods with field studies and analysis. Stages of research include literature studies, primary data collection in the form of variable time of completion and secondary data then analyzed by comparing the completion time of the second method of erection girder on girder with a span of 20.8 meters and 40.8 meters. The results of the comparison of completion time were obtained on a 20.8 meter span erection girder seen from the shortest time Crane Method was more efficient 61.44% than the Launcher Method, the longest time Crane Method was more efficient 32.13% of the Launcher Method, and Method average time Crane is more efficient 52.15% than the Launcher Method. Then on the span erection girder 40.8 m seen from the shortest time Crane Method is more efficient 61.48% than the Launcher Method, the longest time Crane Method is more efficient 29.82% than the Launcher Method, and the average time of the Crane Method is more efficient 41, 81% of the Launcher Method.

Keywords


erection girder, precast girder, crane method, launcher method

Full Text:

PDF

References


Husein, W.S, Dinariana, D., 2013, Perbandingan Gantry Dan Mobile Crane Pada Jalan Layang Dari Segi Waktu, Metode Kerja, Dan Biaya. https://www. google.com/ url?sa=t&rct= j&q= &esrc=s&source=, (13 Agustus 2018).

Octario, T., 2015, Metode Pelaksanaan Dan Analisis Produktivitas Gantry Launcher Pada Pekerjaan Erection Girder Proyek Flyover Palur, Tugas Akhir, Yogyakarta, Jurusan Teknik Sipil Universitas Gajah Mada.

Permadani, C.P., 2016, Metode Pelaksanaan Erection PCI Girder dan Analisis Produktivitas Menggunakan Alat Gantry Launcher pada Proyek Pembangunan Jalan Tol Surabaya-Mojokerto Seksi 1B. Tugas Akhir, Yogyakarta, Jurusan Teknik Sipil Universitas Gajah Mada.

Pratama , D.D., 2013, Analisa Perbandingan Metode Erection Girder Menggunakan Launcher Girder Dan Temporary Bridge Dari Segi Biaya Dan Waktu Pada Jembatan Kali Surabaya Mojokerto, JURNAL TEKNIK POMITS, Vol. 1, No. 1, Hal. 1-10.

PT. Jatra Sejahtera, 2018, Rev 1, Erection Girder Jembatan Sungai Putih Menggunakan Metode Launcher Crane, Jombang.

Syah, M.S., 2004, Manajemen Proyek Kiat Sukses Mengelola Proyek, Cetakan Pertama. Jakarta: Gramedia Pustaka Utama. Jombang.

Tistogondo, Julistyana, 2004, Studi Efektifitas Waktu dan Biaya Pelaksanaan Erection PCI Girder dengan Metode Crawler Crane dan Roller Skate (Kasus: Proyek Pembangunan Jembatan Suramadu Sisi Surabaya), , Jurnal Neutron, Vol. 4, No. 1, Hal. 79-106.




DOI: http://dx.doi.org/10.32497/wahanats.v24i1.1606

Refbacks

  • There are currently no refbacks.


ABOUT JOURNAL

 POLICIES

SUBMISSION

 PEOPLE


OFFICE INFORMATION

 Publisher : Jurusan Teknik Sipil, Politeknik Negeri Semarang  wahanasipil@polines.ac.id, jurnalwahana@gmail.com https://jurnal.polines.ac.id/index.php/wahana
 Department of Civil Engineering, Politeknik Negeri Semarang (State Polytechnic of Semarang) Jl. Prof. Sudarto, SH, Tembalang, Semarang, Indonesia 50275  +62 24 7473417 Ext. 212 For Journal Subscription

Creative Commons License
Wahana TEKNIK SIPIL: Jurnal Pengembangan Teknik Sipil (p-ISSN : 0853-8727 | e-ISSN : 2527-4333) is published by Politeknik Negeri Semarang under Creative Commons Attribution 4.0 International License.
slot gacor slot gacor hari ini slot gacor 2025 demo slot pg slot gacor slot gacor