The bored pile foundation work at the locations of Kali Konteng, Sangu Banyu, and Kali Mataram in the Yogyakarta - Bawen Toll Road Construction Project Section 1 Package 1 exhibits differences in planned and actual (field) load-bearing capacity values. The aim of this study is to analyze the load-bearing capacity values of bored piles. This research utilizes secondary data in the form of planning data, PDA test results, and N-SPT data. Load-bearing capacity calculations are conducted using a conventional method with the Reese & Wright formula. The research findings reveal that the ultimate load-bearing capacity of cast-in-place concrete bored piles calculated based on N-SPT data using the Reese & Wright 1977 method is 1918.08 tons at the Kali Konteng location, 1532.34 tons at the Sangu Banyu location, and 1416.34 tons at the Kali Mataram location. Meanwhile, the planned load-bearing capacity at the Kali Konteng location is 1312.5 tons, at the Sangu Banyu location is 1175 tons, and at the Kali Mataram location is 1300 tons. At the abutment locations of Kali Konteng and Sangu Banyu, the load-bearing capacity values based on the PDA Test exceed the planned load-bearing capacity values but are smaller than the load-bearing capacity values calculated using the Reese & Wright method. Conversely, at the abutment location of Kali Mataram, the load-bearing capacity value determined by the PDA Test exceeds both the planned load-bearing capacity value and the load-bearing capacity value calculated using the Reese & Wright method.


Keywords


Load-bearing capacity, Bored pile, PDA, N-SPT, Reese & Wright

Full Text:

PDF

References


Afifa, Rahma Nur. 2021. Analisis Daya Dukung Bore Pile Pada Pembangunan Jembatan Kereta Api Antara Araskabu-Tebing Tinggi dan Lintas Tebing Tinggi-Siantar. Tugas Akhir, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Muhammadiyah Sumatera Utara.

Agus, S., Renaningsih, & Riska, A.C., 2020. Perencanaan Fondasi Tiang Bor Abutment Jembatan Kali Kendeng (Perbandingan Metode Meyerhof dan Metode Reese & Wright). Jurnal Dinamika Teknik Sipil, Vol. 13, Hal. 30-36.

Fleming, Ken, Austin Weltman, Mark Randolph dan Keith Elson. 2009. Piling Engineering. Taylor & Francis Group, New York.

Nindita, P., Prajna, E.N., Sudarmono, Karnawan, J.S., & Anung, S., 2022. Komparasi Kapasitas Daya Dukung Tiang Pancang Berdasarkan Data N-SPT, Kalendering dan PDA Test. Jurnal Bangun Rekaprima, Vol. 08 2 Oktober 2022, Hal. 71-77.

Proyek Pembangunan Jalan Tol Yogyakarta-Bawen Paket 1 Seksi 1. 2022. Work methode statement Pekerjaan Bored pile. Yogyakarta: PT. Adhi Karya (Persero) Tbk.

Proyek Pembangunan Jalan Tol Yogyakarta-Bawen Paket 1 Seksi 1. 2022. Work methode statement Pengujian Pondasi Pile Driving Analyzer. Yogyakarta: PT. Adhi Karya (Persero) Tbk.

Ully, N.F., & Halimah, T., 2018. Analisa Daya Dukung Pondasi Bored pile Berdasarkan Data N-SPT Menurut Rumus Reese & Wright dan Penurunan. Jurnal IKRA-ITH Teknologi, Vol. 2 No. 3 November 2018, Hal. 7-13, ISSN. 2580 – 4308.

Warouw, P.J., Rangkang, J., & Saerang, E.J., 2022. Analisis Daya Dukung Pondasi Bored pile Jembatan Kalasey Dengan Tes PDA Pada Jalan Manado Outer Ringroad III STA 9+ 799. Prosiding Seminar Nasional Produk Terapan Unggulan Vokasi, Politeknik Negeri Manado, Vol I, No. 1, 2022




DOI: http://dx.doi.org/10.32497/bangunrekaprima.v10i1.5491